tosspaper
Built for heavy civil

Procurement should be live.
(Not in PDF)

Stop emailing PDFs back and forth. Turn tender documents into trade packages, collect vendor quotes, manage revisions, and keep every conversation connected in one live procurement record.

Upload your first tender

Your first tender breakdown is free. No card needed.

tosspaperM
‹ All tendersMaple Ridge Road Upgrades, Phase 2Closes Nov 20, 2026
Overview
Trade packages
Quotes
Updates
Messages
Contact book
Northline CivilGeneral Contractor
Maple Ridge Road Upgrades, Phase 2 Pending
District of Northfield · Closes Nov 20, 2026
‹ Quotes · Underground Works, Watermain
Ridgeline Hauling
quotes@ridgelinehauling.ca · Revision 2 · Oct 1, 2026
Copy transaction link
$318,600.00
Accepted
RFQ SentSep 24
Quote ReceivedOct 1 · Rev 2
Purchase OrderIssue PO
Packing SlipLocked
InvoiceLocked
Line items3 of 3 priced
DescriptionQtyUnit rateExtended
200mm PVC watermain, DR181,850 M$112.00$207,200.00
200mm gate valve c/w box24 EA$2,350.00$56,400.00
Hydrant assembly8 EA$6,875.00$55,000.00
Quoted total$318,600.00

Not another place to manage PDFs.
A different way to run procurement.

Your real competitor isn't another app. It's the email, Excel, and PDF routine you run on every bid. Here's what changes.

Static RFQ PDFs
Live RFQs
Quotes arrive by email
Quotes stay attached to the tender
Addenda sent out by email
Changes tracked and sent out from one place
Calling and emailing vendors to follow up
Vendor responses tracked as they happen
A separate file for every transaction
One connected procurement record

From bid package to RFQs out in minutes.

01Upload

Drop in the bid package

Specifications
288 pages
Drawings
94 sheets
Schedule of quantities
12 pages
Addendum 1
6 pages
398 pages in one upload
02Tender breakdown

Scope splits into trade packages

Underground Works, Watermain64 lines
Site Preparation and Earthworks25 lines
Roadworks and Paving13 lines
Fencing, Site Furnishings and Restoration11 lines
Concrete Works4 lines
Water Storage and Wastewater Facilities3 lines
Electrical and Cathodic Protection2 lines
Water Treatment Facility1 line
Existing Facility Decommissioning1 line
Signage1 line
125 lines sorted into 10 trade packages
03RFQs out

Each trade group gets its RFQ

Underground Works, Watermain4 vendorsSent
Site Preparation and Earthworks4 vendorsSent
Roadworks and Paving4 vendorsSent
Fencing, Site Furnishings and Restoration3 vendorsSent
Concrete Works3 vendorsSent
Water Storage and Wastewater Facilities3 vendorsSent
Electrical and Cathodic Protection2 vendorsSent
Water Treatment Facility2 vendorsSent
Existing Facility Decommissioning2 vendorsSent
Signage2 vendorsSent
29 vendors each seeing only their lines

Everyone works in the same document.

Contractors
Vendors

Tosspaper works across companies, not just within them. Your vendors don't need new software to work with you.

Vendors respond free

No subscription to answer an RFQ. Nothing standing between your vendor and a price.

They price right on the RFQ

They open your RFQ from a link and fill in their rates. No PDF to download, mark up, and send back.

Everything lands on your bid

Quotes, revisions, and questions show up on the tender, sorted by trade package.

RFQ tracking

Know who's in. No emails, no phone calls.

See who opened your RFQ, who's interested, and who declined, trade by trade.

Focus on the bid

Spend more time putting the bid together and less time chasing vendors.

Viewed, interested, declined, quoted

Every vendor's status shows up on the trade package as soon as they act.

Spot the gaps early

If a trade has no takers, you know days out, not the morning of close.

tosspaperM
‹ All tendersMaple Ridge Road Upgrades, Phase 2Closes Nov 20, 2026
Overview
Trade packages
Quotes
Updates
Messages
Contact book
Northline CivilGeneral Contractor
Maple Ridge Road Upgrades, Phase 2 Pending
District of Northfield · Closes Nov 20, 2026
Trade Packages
Trade packages, recipients, interest, and RFQ sending.
+ New package
Search trade groups…
Underground Works, Watermain
64 lines · 4 invited
Site Preparation and Earthworks
25 lines · 4 invited
Roadworks and Paving
13 lines · 4 invited
Fencing, Site Furnishings and Restoration
11 lines · 3 invited
Concrete Works
4 lines · 3 invited
Roadworks and Paving
Base course, asphalt paving, curb and gutter
Send RFQ Tracking
All (4)Quoted (1)Interested (1)Declined (1)Viewed (3)
Ridgeline Hauling
quotes@ridgelinehauling.ca
Quoted
Valley Asphalt Ltd
estimating@valleyasphalt.ca
Interested
Coastline Paving
bids@coastlinepaving.ca
Declined
Roadworks and Paving
Ridgeline HaulingQuoted
Valley AsphaltInterested
Coastline PavingDeclined
Summit AggregatesAwaiting
tosspaperM
‹ All tendersMaple Ridge Road Upgrades, Phase 2Closes Nov 20, 2026
Overview
Trade packages
Quotes
Updates
Messages
Contact book
Northline CivilGeneral Contractor
Updates
Changes to packages and documents reach vendors when you send them as an update.
5 changes not sent to vendors
Roadworks and Paving
Changed 2.04 Granular base course, depth increased from 300 mm to 350 mm
Quantity: 4,200 → 4,900 t
Changed 2.07 Asphalt paving, 50 mm surface lift
Quantity: 9,800 → 9,150 m²
Added 2.11 Asphalt pavement removal, full depth
1,240 square metres
Documents
Added Addendum_No_1_Maple_Ridge_Road_Phase_2.pdf
Added Addendum_No_2_Maple_Ridge_Road_Phase_2.pdf
Message to vendors (optional)
Shown above the changes in the email.
Send update to all vendors
Addendum No. 2 · Roadworks and Paving
Changed Granular base course
4,200 → 4,900 t
Added Asphalt pavement removal
1,240 m²
Addendum circulation

One addendum. Every vendor notified.

Addendum changes a quantity two days before close? Tosspaper lists every change line by line, old and new, and sends it to your vendors as one update. No new email round, no one pricing last week's drawings.

Every change, line by line

Changed quantities show old and new. Added items and new documents are marked, so nobody has to compare PDFs by eye.

Sent as one update

All the changes and the addendum PDFs go out together, with your note on top. Nobody falls off the CC or BCC list.

It stays with the bid

The addendum lives on the live bid, not in someone's inbox. Fewer scope gaps from missed circulation.

Quote discussion

Keep the conversation with the quote.

Ask the vendor a question right on their quote. The answer, and any revised price, stays attached to it. Not buried in someone's inbox.

One conversation, not another email thread

Clear up the scope and keep the answer beside the line it refers to.

The whole team sees it

Estimators, PMs, and purchasing all see what was asked and what was agreed. Nobody has to forward anything.

tosspaperM
‹ All tendersMaple Ridge Road Upgrades, Phase 2Closes Nov 20, 2026
Overview
Trade packages
Quotes
Updates
Messages
Contact book
Northline CivilGeneral Contractor
Maple Ridge Road Upgrades, Phase 2 Pending
District of Northfield · Closes Nov 20, 2026
Messaging
Questions and quotes in one place.
All vendors Broadcast update
Vendors
Broadcast
Message everyone
Ridgeline Hauling $312,400
quotes@ridgelinehauling.ca
Summit Aggregates
sales@summitagg.ca
Ridgeline Hauling
Does the watermain rate include bedding and backfill?
You asked for changes · Rate too high
Bedding and backfill are included. Sharpened the rate on line 4, revised quote is in.
Revision 2 received · $318,600.00
You accepted the quote
Ridgeline Hauling · Watermain
Does the watermain rate include bedding and backfill?
Included. Sharpened the rate on line 4, revised quote is in.
Revision 2 received · $318,600.00
Where Tosspaper is going

From first quote to final invoice.

Tosspaper starts with tender breakdowns, RFQs, and vendor quotes. We're building towards a connected procurement record where purchase orders, packing slips, and invoices live alongside the original transaction.

RFQAvailable now
QuoteAvailable now
Purchase OrderComing in 2027
Packing SlipComing in 2027
InvoiceComing in 2027

No disconnected PDFs. No fragmented records. One continuous procurement trail.

Our vision

Construction procurement shouldn't take this much admin.

Our vision is to reduce the administrative work behind construction procurement by more than 80%. We're building Tosspaper to eliminate repetitive tasks, disconnected paperwork, and unnecessary back and forth, so contractors, subcontractors, and suppliers can do more business with a fraction of the overhead.

Type it once

The RFQ line becomes the quote line, the PO line, and the invoice line.

Nothing to chase

No attachments bouncing between your inbox and the vendor's.

Faster sign off

Approve deliveries and invoices with the backup already attached.

Less admin

Less time chasing paperwork. More time running jobs.

Security

Your pricing stays yours.

Vendor quotes, bid numbers, and shared tender documents remain protected. Each vendor only sees the information intended for them.

Security commitment

SOC 2

Readiness in progress

Pricing

Start free. Scale your procurement as you grow.

You only pay when Tosspaper breaks down a tender for you. Bids and RFQs you build by hand are free on every plan, and your vendors never pay to respond.

Free

CA$0to start

Try it on a real tender before you pay anything.

1 tender breakdown, one time
Up to 500 pages
No card needed
Unlimited hand built bids and RFQs
Most teams start here

Starter

CA$350/mo

or CA$3,500/yr, 2 months free

For a GC bidding a few tenders a month with one or two estimators.

3 tender breakdowns a month
Up to 500 pages per breakdown
CA$150 per breakdown over plan
CA$0.25 per page beyond 500
Unlimited hand built bids and RFQs

Growth

CA$550/mo

or CA$5,500/yr, 2 months free

For a busy estimating team bidding most weeks.

5 tender breakdowns a month
Up to 500 pages per breakdown
CA$125 per breakdown over plan
CA$0.25 per page beyond 500
Unlimited hand built bids and RFQs

Pro

CA$850/mo

or CA$8,500/yr, 2 months free

For contractors bidding several tenders a week.

10 tender breakdowns a month
Up to 500 pages per breakdown
CA$100 per breakdown over plan
CA$0.25 per page beyond 500
Unlimited hand built bids and RFQs

What's a tender breakdown? One tender package uploaded and split into trade packages for you.

Going over your plan: extra breakdowns and pages are added to your monthly invoice. You see the cost before anything runs.

Change plans anytime: moving up starts today. Moving down starts when the period you've already paid for ends.

All prices in Canadian dollars.

FAQ

Questions estimators ask.

Something else on your mind? Email feedback@tosspaper.com

Pretty accurate. It does the heavy lifting on scope, quantities, and trade packages. As with any AI, a person should make the final call, so every breakdown comes back for you to check and edit before a single RFQ goes out.
No, never. Vendors can receive, review, and price RFQs completely free without an account or subscription.
Only authorized members of your team and the specific vendor invited to that trade package. Vendors never see other vendors' quotes or unassigned trade scopes.
You only pay when Tosspaper breaks down a tender document. Plans start at CA$0 with your first tender breakdown free, then scale from CA$350/month.
You can upload packages up to 500 pages per breakdown included on all standard plans, with support for larger packages at CA$0.25 per additional page.
Upload the addendum document. Tosspaper automatically identifies changes line-by-line and lets you circulate updates to all affected vendors in one click.
Tosspaper currently covers RFQs and quotes, with seamless conversion to purchase orders, packing slips, and invoice management launching in 2027.
tosspaper

Construction procurement, off paper.

A tracking number for every procurement.

RFQ
Quote
PO
Packing slip
Invoice
Upload your first tender

First tender breakdown free. No card needed.